Skip to main content

Coating of the PCB

Materials used

Make sure you have enough ventilation. Refer to the manual of the product or contact the seller for further information.

Make sure to let it dry for at least a day before installing it. Also, don't cover the ESP32 metal plate and the DC-DC converters next to the green screw terminals.

Coating the VESC2X3Bridge.